PetroChina Site Index Contact Us Chinese Home
 
Algeria
Azerbaijan
Canada
Chad
Ecuador
Equatorial Guinea
Indonesia
Iran
Iraq
Kazakhstan
Libya
Mauritania
Mongolia
Myanmar
Niger
Nigeria
Oman
Peru
Russia
Sudan
Syria
Thailand
Tunisia
Turkmenistan
Uzbekistan
Venezuela
 
CNPC in Algeria

CNPC embarked upon oil and gas operations in Algeria since 2003, involving oilfield exploration and development, refinery construction and operation, and refined products marketing, while also providing oilfield services.



 
Oil and Gas Operations
Oilfields Services, Engineering and ConstructionMajor Events 
 CNPC has acquired the exploration licenses for Block 102a /112, Block 350 and Block 438b in Algeria. We also operate the Adrar upstream and downstream integrated project.
 
 Related News
CNPC's Algerian employees send letter of sympathy
 CNPC's refinery in Algeria begins operation
 
CNPC obtains high-yield oil and gas flow from well HEB A-1 in Algeria
 
 Block 102a /112

On December 22, 2003, CNPC signed an agreement on an exploration license for Block 102a /112 with SONATRACH. CNPC owns 75% equity of the block. The block is located in the Chelif Basin in the north of Algeria, covering an area of 9,923 square kilometers. 2-D and 3-D seismic data acquisition and processing for Block 102a /112 have taken place as scheduled.

Block 350

On December 22, 2003, CNPC signed an agreement on an exploration license for Block 350 with SONATRACH. CNPC owns 75% equity of the block. Block 350 is located in the northwestern Oued Mya Basin in the north of the Sahara Desert, covering an area of 8,666.1 square kilometers. In 2006, an oil and gas discovery was made in BEL-E-1, the first exploration well in the block. In 2008, a 215Kcm/d gas flow was obtained from the barefoot interval in horizontal well Bel Z-1, which was drilled using underbalanced drilling techniques.

Block 438b

CNPC won the bid for Block 438b with 100% equity on July 29, 2004. The contract is a PSA one with a 7-year exploration term and a 25-year development term. The block is located in the Oued Mya Basin and covers an area of 4,354 square kilometers. In 2006, the first exploration appraisal well HEB-A-1 in Block 438b was spudded. In February 2007, a high yield oil and gas flow was obtained from well HEB-A-1, achieving a daily output of 700 cubic meters of light crude oil and 220,000 cubic meters of natural gas after testing. In 2008, BHT and HEB-A reservoirs were successfully appraised, identifying more proven reserves.

Adrar Upstream and Downstream Integrated Project

On May 12, 2003, CNPC won the tender for the Adrar upstream and downstream integrated project with a contract term of 23 years. The project is composed of three parts — oilfield appraisal and development, construction of a refinery and marketing of refined products. On July 14, 2003, CNPC and Algeria State Oil Company (SONATRACH) signed the Shareholders Agreement of the Refining Company of Adrar project. CNPC and SONATRACH have 70% and 30% holdings in the project.

In 2006, the construction of an oilfield with an annual output of 600,000 tons was completed, and in April, 2007, a 600kt/a refinery was put into production. In 2008, Adrar Refinery processed 543,000 metric tons of crude oil.
 
  
2008 China National Petroleum Corporation Legal Privacy Statement